BART opens, 1972
From the 1957 district to the 61.2 percent bond vote of 1962, the September 11, 1972 opening with 28 miles and 12 stations, and Transbay service in 1974.
On September 11, 1972, Bay Area Rapid Transit carried its first passengers, and not one of them was in San Francisco. The first trains ran in the East Bay, from Fremont to the MacArthur station in Oakland, 28 miles with 12 stations. San Francisco, promised the system's best-known feature, had to wait. The Transbay Tube, the tunnel under the bay linking Oakland to the city, did not carry passengers until September 16, 1974. The road from first idea to a train under Market Street ran more than a quarter of a century and took in a redrawn map, a lawsuit and a vote that cleared the required line by the narrowest of margins.
The idea, 1946 to 1957
The concept dates to 1946, when business and civic leaders on both sides of the bay began meeting informally about how to move people between San Francisco and the East Bay. A joint Army and Navy review board in 1947 concluded that another link between San Francisco and Oakland would be needed, and it proposed an underwater tube for electric trains. In 1951 the state legislature created the 26-member San Francisco Bay Area Rapid Transit Commission, with representatives from nine counties.
The commission's report in 1957 recommended a five-county district. The legislature formed the San Francisco Bay Area Rapid Transit District, covering Alameda, Contra Costa, Marin, San Francisco and San Mateo counties. The district received the power to tax at five cents per $100 of assessed value. The legislature also lowered the voter approval needed for general obligation bonds from two-thirds to 60 percent, a change that would matter enormously five years later.
For the next several years the engineers worked on a plan for grade-separated electric trains with top speeds of 75 to 80 miles an hour and average speeds around 45. The aim was a rapid line, closer to a regional subway than a streetcar.
Two counties drop out
The five-county plan did not survive the approval process. In December 1961 San Mateo County withdrew, citing the cost and the existing Southern Pacific commuter service on the Peninsula. Marin County withdrew in early 1962, because its tax base could not absorb its share of the costs and because of a dispute over whether trains could be carried across the Golden Gate Bridge. That left San Francisco, Alameda and Contra Costa counties. Their supervisors approved a three-county plan in July 1962 and put it on the November ballot.
The effect of the withdrawals shows on a map of the present system. BART serves San Francisco, the East Bay and, since a later extension, San Mateo County and part of Santa Clara County. Marin never joined, and the Peninsula was left to the existing commuter rail line, Caltrain, until BART reached San Mateo County later with an extension to the airport and Millbrae, which opened in 2003.
The 1962 vote
The bond measure on the November 1962 ballot asked voters to approve $792 million to build a 71.5-mile system with 33 stations in 17 communities. It also included money to rebuild 3.5 miles of the San Francisco Municipal Railway, work that would eventually be tied to the Market Street subway. The measure needed 60 percent of the vote. It passed with 61.2 percent.
The margin was thin enough to feel precarious, and the total cost estimate in 1962, $996 million including the Transbay Tube and rolling stock, was already a large sum. The tube alone was projected at $133 million and was financed with bonds backed by Bay Bridge revenues rather than the general obligation bonds.
A lawsuit and a thousand agreements
About a month after the vote a taxpayer suit challenged the bond election and the district's legality. The court ruled for the district, but six months of litigation cost an estimated $12 million in construction delays. Another source of delay was the web of 166 separate agreements the district had to reach with cities, counties and special districts. The page BART publishes on its early history calls those agreements a major unforeseen cost factor.
The district's board was reshaped in 1965 into 12 directors, four per county. Construction began in the 1960s, and over the following years crews built elevated structures through the East Bay, a subway through downtown Oakland and Berkeley and under Market Street in San Francisco, and the Transbay Tube between them. The first trains did not carry passengers until 1972.
September 11, 1972
The first service was a stretch of the East Bay line: Fremont to MacArthur, 28 miles and 12 stations. It was a start, and for passengers in San Francisco it was an announcement more than a service. The system grew in stages across 1972 to 1974, adding lines and stations as each section of track was finished.
San Francisco's turn came two years later. On September 16, 1974, the Transbay Tube opened to passengers, and BART trains could travel under the bay from Oakland to Embarcadero Station and the subway under Market Street.
What it did to the map of San Francisco
BART gave San Francisco a regional subway with several stations in the city. Eight BART stations now sit within the city limits: Embarcadero, Montgomery Street, Powell Street, Civic Center, 16th Street Mission, 24th Street Mission, Glen Park and Balboa Park. The first four lie under Market Street and share the subway with Muni Metro, with BART below the Muni platforms. The Mission stations anchor the commercial corridors of the Mission District (Mission District), and Civic Center Station serves City Hall, the Main Library and the War Memorial buildings (Civic Center).
It also changed how people reached the city. The old routes across the bay had been the ferries, the Bay Bridge's lower deck and the buses that used the bridge (The Bay Bridge opens, 1936). The Transbay Tube made a rail trip across the water possible and gave commuters a new alternative to the car, in the same years the city was arguing about what to do with its freeways (The Embarcadero Freeway, 1968 to 1991).
From vote to train
The gap between ballot and ride measures how hard the project was. Voters approved the bond in November 1962. The first trains carried passengers in September 1972, nine years and ten months later, and San Francisco riders waited until September 16, 1974, a little under twelve years after the vote. Counted from the first informal meetings in 1946, the whole undertaking took 26 years to reach its first passengers. For a region used to building quickly, the length of that wait is part of why BART's opening was celebrated.
Where the system stands in 2026
The district that began as five counties and settled at three has grown again. BART, headquartered in Oakland, now runs about 131 miles of track and 50 stations, including the eBART line to Antioch and the Oakland Airport Connector. Of those stations, 22 are in Alameda County, 12 in Contra Costa, 8 in San Francisco, 6 in San Mateo and 2 in Santa Clara. Five named lines run through Oakland, and all but one of them cross the bay through the Transbay Tube to San Francisco. Ridership in the second quarter of 2026 averaged about 204,800 weekday trips, and the system carried about 55.5 million trips in 2025, making it the seventh busiest rapid transit system in the United States.
BART serves San Francisco International Airport with a station at the terminal (BART from the Transbay Tube to SFO), and riders can pay with the regional Clipper card or with contactless cards and phones at the fare gates. How to use it from the city, including the connection to Caltrain, is explained in Using BART and Caltrain from San Francisco, and the transit agencies in the region are introduced in San Francisco Municipal Transportation Agency.
The plan against the opening, in numbers
Set what voters approved beside what opened and you can see how much of the system arrived in stages.
| Measure | 1962 bond plan | Opening day, 1972 | Network in 2026 |
|---|---|---|---|
| Miles | 71.5 | 28 | about 131 |
| Stations | 33 | 12 | 50 |
| Counties | 3 | 1 (Alameda, from Fremont to Oakland) | 5 with stations |
On opening day the system had about 39 percent of the planned mileage (28 of 71.5) and about 36 percent of the planned stations (12 of 33). Those shares are not a sign of failure, because the 1962 plan was always meant to be built over several years, but they explain why the first service felt more like a promise than a network. Today's totals come from decades of extensions, and they include lines the 1962 plan never contemplated, such as the extensions to San Mateo and Santa Clara counties and the eBART line to Antioch.
The comparison also shows why the voters' margin mattered. A bond of $792 million for a system of 71.5 miles and 33 stations was a very large commitment in 1962, and the measure succeeded by clearing the 60 percent line by 1.2 points. Had the threshold stayed at the old two-thirds, the measure would have failed.
Timeline
| Year | Event |
|---|---|
| 1946 | Business and civic leaders begin meeting about a bay crossing |
| 1947 | An Army and Navy board proposes an underwater tube |
| 1951 | The legislature creates the Rapid Transit Commission |
| 1957 | The five-county district is formed; the bond threshold is lowered to 60 percent |
| 1961 and 1962 | San Mateo and Marin counties withdraw |
| November 1962 | Voters approve the $792 million bond, with 61.2 percent |
| 1965 | The board is reorganized to 12 directors |
| September 11, 1972 | The first service, Fremont to MacArthur |
| September 16, 1974 | The Transbay Tube opens |
Reading the history
Three points from the record help anyone trying to understand the system as it stands now. First, the geography was a political result: San Mateo and Marin withdrew, so BART's footprint reflects what voters and officials in each county would pay for. Second, the vote cleared the 60 percent threshold by only 1.2 points. Third, the 1972 opening came in pieces. Passengers in San Francisco did not ride until two years after the first trains ran in the East Bay, and the Transbay Tube, the part that made BART a regional network, was the last piece to arrive.