The Salesforce Transit Center
How the 2018 transit hub rose where the Transbay Terminal stood, what its bus deck and rooftop park do, and why the train extension is still unfinished.
Walk south from Market Street between Beale and Second and you run into a long, pale building that is, when you get down to it, a bus station with a park on its roof. The Salesforce Transit Center opened August 12, 2018, in place of a terminal that had served the Bay Bridge for almost seventy years. It lasted six weeks before it shut down. How it got built, why it closed and what it was supposed to become says a fair amount about how big transit projects get done in this town, which is to say slowly, in pieces, and with an argument at every stage.
The terminal that came first
Start with the old Transbay Terminal. It opened in 1939, in the Bay Bridge's first years, as a depot for the interurban electric trains that crossed the new bridge's lower deck from the East Bay. The trains quit in 1958, and the terminal was turned over to buses. Coaches from across the East Bay and the North Bay rolled into the building on ramps tied straight to the bridge, and for a generation of downtown commuters that was the front door to the city.
It did not age well. The 1989 Loma Prieta earthquake, the same one that closed a stretch of the Embarcadero Freeway (see The Embarcadero Freeway, 1968 to 1991) and dropped a section of the Bay Bridge's upper deck (see The 1989 Loma Prieta earthquake), damaged the terminal too. Buses moved to a temporary terminal nearby. The old structure and its ramps came down in stages, and the last of the work was finished in 2011. That left a long, narrow lot in South of Market, waiting for something bigger.
What the new center is
The Transbay Joint Powers Authority owns the place. A joint powers agency is the legal device by which several public bodies share one project, and this one was created to build and run the replacement for the old terminal. Pelli Clarke Pelli, the firm led by Cesar Pelli, was the architect, with Adamson Associates as executive architect.
The building stacks its jobs, one on top of another:
- The street level and concourse hold the entrances, ticketing and waiting areas along Mission, Howard and Natoma Streets, plus the large central hall.
- The bus deck sits above, with bus bays arranged around a central waiting area. A dedicated ramp, part of it a cable-stayed bridge, runs from the deck straight to the Bay Bridge, so transbay buses get to the building without touching downtown streets.
- The rooftop park, Salesforce Park, covers about 5.4 acres. It opened the same day as the bus deck, and it turns a block-long transit building into one of the few spots downtown where a person can sit under trees.
- Below the concourse is a train box, a deep shell built to receive trains that do not yet run there.
The naming rights deal was announced July 7, 2017: the company agreed to put its name on the center, and the park became Salesforce Park. The same company's tower, which opened in 2018 at 1,070 feet, stands next door. The tower takes the skyline; the center runs along its base. Anyone searching for the pair will find them on the same topic page for exactly that reason (see South of Market).
Six weeks, then a closure
The opening got its ribbon and its celebration. On September 25, 2018, six weeks later, workers found a crack in a steel beam that helps hold up the bus deck, and the center closed. A second cracked beam turned up the next day. The Transbay Joint Powers Authority announced repairs complete on May 10, 2019, and the full facility reopened August 11, 2019.
The shutdown mattered beyond the headline. Bus operators had to find other places to stop, and commuters who had just gotten used to the new building went back to temporary arrangements for months. It was a reminder of how much rides on a structure most people think about only when they are late for a bus. It also fed a civic argument over oversight of large construction projects, and over who answers when a publicly owned structure fails soon after it opens. What followed was the ordinary sequence for a structural problem: inspection, repair and a reopening.
What it is for
A transit center is more than its bus bays. This one was planned as the downtown hub of three systems at once:
- Transbay and regional buses. East Bay commuter buses, AC Transit among them, and other regional services use the deck. The ramp to the Bay Bridge is why those buses get in quickly.
- Local transit. Muni routes run on the streets around the center, and the nearby Embarcadero and Montgomery stations connect to BART and the Muni Metro. How Muni's routes fit the grid is covered in muni's route names and what they mean, and the local rider's view is in How to ride Muni.
- Trains, eventually. The train box under the building was built so Caltrain and, in the long term, high-speed rail could reach the center directly instead of stopping at the station at Fourth and King Streets.
That third piece is the one that has not happened. Caltrain, the commuter railroad from San Jose, still ends at Fourth and King, a bus or streetcar ride from the Transit Center (see Using BART and Caltrain from San Francisco). Passengers who work downtown close the gap on Muni or on foot.
Why the ramp matters
Most of what makes the place useful can't be seen from the sidewalk. The Bay Bridge pours a great deal of traffic into the city's southeastern corner every day, and a bus that has to leave the bridge, wind through the streets south of Market and then hunt for a curb loses minutes on every trip. The dedicated ramp keeps a transbay bus off those streets until it reaches its stop on the deck, the same arrangement the old terminal had. The bus deck is the building's reason to exist, and the park, the shops and the tower next door grew up around it.
The center also changed how people walk the neighborhood. For decades Mission and Howard Streets led to a low, enclosed terminal; now they run along a building with entrances on several sides and a park overhead. From the block around it, the Financial District is a short walk north (see Financial District), and the South of Market streets to the south and west lead toward the Moscone Center and Yerba Buena (see South of Market).
The train extension
The planned extension is called The Portal, formerly the Downtown Rail Extension. It is a tunnel that would carry Caltrain, and potentially California high-speed rail, from Fourth and King to the Transit Center's train box. Full funding has not yet been secured. As of May 2024, the project was projected to cost $8.25 billion, with construction expected to begin in 2025 and finish in 2032. A $3.4 billion federal pledge depends on local matching funds. Those figures move as the financing gets worked out, so the Transbay Joint Powers Authority's own pages are the place for current numbers.
The box under the center shows a decision to build ahead. The authority built the underground shell as part of the original project, because adding it later, beneath a finished building and a finished park, would have been far harder. It sits empty until the tunnel is funded and dug.
Seeing it in practice
On a free afternoon, the rooftop park is the point. It is a curated landscape of plantings, paths and open lawn on a deck above a working bus station. Anyone can walk in, and it is a short walk from the downtown BART and Muni Metro stations.
A commuter cares about other things: bay assignments and schedules, which each bus operator posts and changes. The operators' own pages rule on those; nothing about a bus deck stays fixed for long.
Where it sits in the city's plan
The Transit Center anchors a larger redevelopment of the area around Transbay, which the city planned as a dense, mixed-use district of towers, housing and a new street network. The planning rules for the area sit with the Planning Department (see San Francisco Planning). Transit operations belong to the operators and the joint powers authority, and the Municipal Transportation Agency runs Muni routes on the surrounding streets (see San Francisco Municipal Transportation Agency).
That split is typical of the Bay Area. The center sits in San Francisco, belongs to a joint authority, is paid for by a mix of local, state and federal money, and is served by agencies from three or more counties. It was built to fix a shortcoming of the old terminal: the Bay Bridge's buses were all in one place, but the trains were not. Eight years after opening, the bus half of that vision works. The rail half is a tunnel that has been drawn and costed but not yet dug.
A short timeline
- 1939: The Transbay Terminal opens for the Bay Bridge's interurban trains.
- 1958: The trains stop, and the terminal becomes a bus station.
- 1989: The Loma Prieta earthquake damages the terminal.
- 2011: Demolition of the terminal and its ramps is complete.
- July 7, 2017: Salesforce's naming rights are announced.
- August 12, 2018: The Transit Center and its park open.
- September 25, 2018: The center closes after a cracked beam is found.
- August 11, 2019: The full facility reopens.
Before a trip, the Transbay Joint Powers Authority's site has the word on bus operations and the train extension, and the SFMTA's alerts page (https://www.sfmta.com/getting-around/muni/muni-alerts) has any Muni service changes.